Configuring IAM Reviews
23666 reviews
Chengcheng Z. · Reviewed about 1 year ago
Himanshu R. · Reviewed about 1 year ago
It was interesting
Sergei O. · Reviewed about 1 year ago
Mario A. · Reviewed about 1 year ago
Mattia D. · Reviewed about 1 year ago
Jefferson D. · Reviewed about 1 year ago
Volker H. · Reviewed about 1 year ago
Vijayananda M. · Reviewed about 1 year ago
Elena D. · Reviewed about 1 year ago
Sandra B. · Reviewed about 1 year ago
Fabian-Florin N. · Reviewed about 1 year ago
Carl D. · Reviewed about 1 year ago
Would have been a 5 stars for me if there was enough time. Pretty much all the labs I do will not go 100% according to plan, so there must be some time to figure out yourself how to fix the script. A lot of things can go wrong, which they went for me, so 3/5 only because of the given time: 1. The project was not visible to the second user. Had to make a direct link call to the project, cost me at least 10 minutes. 2. I had to manually export the DEV_PROJECT env variable and/or set the project inside the UI terminal for everything to work (it was not set automatically for me and there was nothing mentioned about this in the script). Some minutes lost there as well. 3. I implemented the step updating the role permissions wrong. I copied the text from the lab and not from the output of the command. This resulted into [Etag value] not being accepted. Once I realised that, I manually passed the tag from the App Viewer role, but I got an error of not matching. Due to the pressure of time, I only figured out afterwards that I had copied the wrong text. 4. As a result I tried to add the permissions from the UI, but then I was out of time for the check inside the labs. Not that it is important to get the last points whatsoever, but the given time assumes both that we copy paste everything blindly as well as everything works as planned (which was not the case for me) I would like to have the option to digest what is happening inside the UI and have the option to decide myself at what level I want to digest each step of the script. Things not going as planned is totally fine, as long as you have enough time (useful for choosing the depth in which you go through step). My rating in based solely on the lack of the time resource.
Konstantinos S. · Reviewed about 1 year ago
Peter S. · Reviewed about 1 year ago
Martin V. · Reviewed about 1 year ago
Sadanandan N. · Reviewed about 1 year ago
Simon W. · Reviewed about 1 year ago
Hatem S. · Reviewed about 1 year ago
Julia G. · Reviewed about 1 year ago
Vladimir L. · Reviewed about 1 year ago
Christian K. · Reviewed about 1 year ago
Jan Z. · Reviewed about 1 year ago
Javier O. · Reviewed about 1 year ago
Birender S. · Reviewed about 1 year ago
Marco Francesco P. · Reviewed about 1 year ago
We do not ensure the published reviews originate from consumers who have purchased or used the products. Reviews are not verified by Google.