Configuring IAM Reviews

25900 reviews

It was interesting

Sergei O. · Reviewed neredeyse 2 yıl ago

Mario A. · Reviewed neredeyse 2 yıl ago

Mattia D. · Reviewed neredeyse 2 yıl ago

Jefferson D. · Reviewed neredeyse 2 yıl ago

Volker H. · Reviewed neredeyse 2 yıl ago

Vijayananda M. · Reviewed neredeyse 2 yıl ago

Elena D. · Reviewed neredeyse 2 yıl ago

Sandra B. · Reviewed neredeyse 2 yıl ago

Fabian-Florin N. · Reviewed neredeyse 2 yıl ago

Carl D. · Reviewed neredeyse 2 yıl ago

Would have been a 5 stars for me if there was enough time. Pretty much all the labs I do will not go 100% according to plan, so there must be some time to figure out yourself how to fix the script. A lot of things can go wrong, which they went for me, so 3/5 only because of the given time: 1. The project was not visible to the second user. Had to make a direct link call to the project, cost me at least 10 minutes. 2. I had to manually export the DEV_PROJECT env variable and/or set the project inside the UI terminal for everything to work (it was not set automatically for me and there was nothing mentioned about this in the script). Some minutes lost there as well. 3. I implemented the step updating the role permissions wrong. I copied the text from the lab and not from the output of the command. This resulted into [Etag value] not being accepted. Once I realised that, I manually passed the tag from the App Viewer role, but I got an error of not matching. Due to the pressure of time, I only figured out afterwards that I had copied the wrong text. 4. As a result I tried to add the permissions from the UI, but then I was out of time for the check inside the labs. Not that it is important to get the last points whatsoever, but the given time assumes both that we copy paste everything blindly as well as everything works as planned (which was not the case for me) I would like to have the option to digest what is happening inside the UI and have the option to decide myself at what level I want to digest each step of the script. Things not going as planned is totally fine, as long as you have enough time (useful for choosing the depth in which you go through step). My rating in based solely on the lack of the time resource.

Konstantinos S. · Reviewed neredeyse 2 yıl ago

Peter S. · Reviewed neredeyse 2 yıl ago

Martin V. · Reviewed neredeyse 2 yıl ago

Sadanandan N. · Reviewed neredeyse 2 yıl ago

Simon W. · Reviewed neredeyse 2 yıl ago

Hatem S. · Reviewed neredeyse 2 yıl ago

Julia G. · Reviewed neredeyse 2 yıl ago

Vladimir L. · Reviewed neredeyse 2 yıl ago

Christian K. · Reviewed neredeyse 2 yıl ago

Jan Z. · Reviewed neredeyse 2 yıl ago

Javier O. · Reviewed neredeyse 2 yıl ago

Birender S. · Reviewed neredeyse 2 yıl ago

Marco Francesco P. · Reviewed neredeyse 2 yıl ago

Astha S. · Reviewed neredeyse 2 yıl ago

Wolfgang G. · Reviewed neredeyse 2 yıl ago

We do not ensure the published reviews originate from consumers who have purchased or used the products. Reviews are not verified by Google.